Or. Admin. Code § 918-311-0060

Current through Register Vol. 63, No. 12, December 1, 2024
Section 918-311-0060 - Electrical Plan Review for Prefabricated Structures
(1) Authority. The rule is authorized by ORS 479.870 and sets electrical plan review requirements for the electrical aspects of prefabricated buildings and components intended for use in Oregon.
(2) Definitions. For purpose of this rule:
(a) A "prefabricated building" is a "prefabricated permanent building" or "prefabricated relocatable building" defined in OAR 918-674-0005.
(b) A "prefabricated component" is a "component" defined in OAR 918-674-0005;
(c) "Intended for use in Oregon" means:
(A) The structure is manufactured in Oregon and is intended to be used in Oregon, or Oregon and other states; or
(B) Manufactured in another state but intended to be first delivered to Oregon for use in Oregon regardless of whether it is intended to also be used in other states.
(d) "State of manufacture" is the state where a prefabricated building or component is manufactured.
(3) Applicability:
(a) Electrical plan review is required for all prefabricated buildings and components manufactured in Oregon or manufactured out of state for use in Oregon, unless:
(A) The electrical inspector waives the plan review upon a determination that only one unit will be built and code require-ments can be verified by inspection;
(B) The unit is listed by a recognized testing laboratory; or
(C) The unit is certified by special deputies.
(b) When a plan review is required by this rule, the relevant prefabricated structures rules in OAR 918, division 674 are applicable except to the extent a different requirement is provided in this rule.
(4) Requirements. When plan review under this rule is required, the manufacturer shall:
(a) Pay an electrical plan review fee as provided in section (5) of this rule;
(b) Meet the requirements of OAR 918-311-0040 for electrical plan reviews for number of copies, readability and contents; and
(c) Submit a timely request allowing the division at least ten business days to complete the plan review.
(5) Fees. The electrical plan review fees shall be $69 per hour with a minimum charge of $69.

Or. Admin. Code § 918-311-0060

BCD 8-1994(Temp), f. 3-16-94, cert. ef. 3-25-94; BCD 18-1994, f. 8-30-94, cert. ef. 9-1-94; BCD 3-1995, f. & cert. ef. 3-3-95; BCD 19-1996, f. 9-17-96, cert. ef. 10-1-96; Renumbered from 918-320-0345; BCD 9-2001(Temp), f. 8-15-01, cert. ef. 9-4-01 thru 3-3-02; BCD 10-2001, f. 9-28-01, cert. ef. 10-1-01; BCD 7-2018, temporary amend filed 04/19/2018, effective 04/19/2018 through 10/15/2018; BCD 26-2018, temporary amend filed 10/11/2018, effective 10/16/2018 through 04/13/2019;BCD 4-2019, temporary amend filed 04/23/2019, effective 4/23/2019through 10/19/2019; BCD 13-2019, amend filed 10/21/2019, effective 1/1/2020

Statutory/Other Authority: ORS 479.730 & 479.870

Statutes/Other Implemented: ORS 479.730 & 479.870