Or. Admin. Code § 918-282-0010

Current through Register Vol. 63, No. 12, December 1, 2024
Section 918-282-0010 - Electrical Contractor License

An electrical contractor:

(1) Shall continuously employ at least one full-time general supervising electrician except as otherwise exempted;
(2) Is not authorized to make, direct, supervise or control the making of an electrical installation, unless properly licensed; and
(3) Shall display its electrical license at each of the contractor's places of business. If the contractor has multiple places of business, a facsimile of the license may be posted. The object of this requirement is to display the scope of electrical authority held by the contractor

Or. Admin. Code § 918-282-0010

DC 15-1987, f. & ef. 5-15-87; Renumbered from 814-022-0850; BCD 19-1996, f. 9-17-96, cert. ef. 10-1-96; Renumbered from 918-320-0060

Stat. Auth.: ORS 479.730

Stats. Implemented: ORS 479.730 & ORS 479.820