Or. Admin. Code § 918-271-0010

Current through Register Vol. 63, No. 12, December 1, 2024
Section 918-271-0010 - Calls for Inspection
(1) All persons who take out an electrical permit, homeowners as well as electrical contractors, shall request an inspection within three working days of:
(a) The completion of any electrical installation intended to be covered or concealed or that is intended to be placed into service before the final electrical inspection; and
(b) The completion of all electrical installations for the job site covered by a particular permit.
(2) Transactions under a master inspection permit are covered by separate requirements.

Or. Admin. Code § 918-271-0010

BCD 19-1996, f. 9-17-96, cert. ef. 10-1-96; BCD 23-2000, f. 9-29-00, cert. ef. 10-1-00

Stat. Auth.: ORS 479.730

Stats. Implemented: ORS 479.730