Or. Admin. Code § 918-020-0470

Current through Register Vol. 63, No. 12, December 1, 2024
Section 918-020-0470 - Assumption of Responsibility
(1) When waiving government performance of plan review or required inspections, a building official shall require the master builder to sign a form that specifically identifies each waiver and that states that the master builder accepts the duty of performing the review and verifications.
(2) A master builder who accepts the duty of performing a review or verification remains responsible for that duty unless released by written and signed permission of the building official. A building official may release a master builder from a review or verification by a written and signed assumption of the review or inspection duty by the building official or written and signed assumption of the review and verification duty by another master builder.

Or. Admin. Code § 918-020-0470

BCD 6-2002, f. 3-25-02, cert. ef. 4-1-02

Stat. Auth.: ORS 455.805 & ORS 455.810

Stats. Implemented: ORS 455.805 & ORS 455.810