Or. Admin. Code § 860-085-0650

Current through Register Vol. 63, No. 12, December 1, 2024
Section 860-085-0650 - Project Threshold

For the purpose of determining whether an application will be subjected to the procedural process described in either ORS 757.539(6) or (7), Tier-1 and Tier-2 Projects are defined as follows:

(1) A Tier-1 Project is one that has projected costs that would be borne by the ratepayers of the utility proposing the Project that are equal to or less than $1 million and has an overall project cost of less than $85 per metric ton of reduced emissions.
(2) A Tier-2 Project is one that has projected costs that would be borne by the ratepayers of the utility proposing the Project that are greater than $1 million or has an overall project cost of equal to or greater than $85 per metric ton of reduced emissions.

Or. Admin. Code § 860-085-0650

PUC 8-2014, f. & cert. ef. 12/3/2014

Stat. Auth.: ORS Ch. 183, 756 & 757

Stats. Implemented: ORS 757.539