Or. Admin. Code § 845-025-2080

Current through Register Vol. 63, No. 11, November 1, 2024
Section 845-025-2080 - Harvest Lot Segregation
(1) A producer or grow site administrator, within 45 days of harvesting a harvest lot, must:
(a) Physically segregate the harvest lot from other harvest lots;
(b) Place the harvest lot in a receptacle or multiple receptacles;
(c) Record moisture loss by marking the harvest as complete in CTS; and
(d) Ensure all inventory tracking procedures are completed as required by 845-025-7520 to 845-025-7580.
(2) Failure by a licensee to comply with any portion of section (1) of this rule is a Category III violation.

Or. Admin. Code § 845-025-2080

OLCC 3-2015(Temp), f. 12-3-15, cert. ef. 1-1-16 thru 6-28-16; OLCC 6-2016, f. 6-28-16, cert. ef. 6/29/2016; OLCC 15-2017, amend filed 12/22/2017, effective 12/28/2017; OLCC 3-2020, amend filed 01/28/2020, effective 2/1/2020; OLCC 76-2022, minor correction filed 03/24/2022, effective 3/24/2022

Statutory/Other Authority: ORS 475C.017 & 475C.065

Statutes/Other Implemented: 475C.065 & ORS 475C.177