Or. Admin. Code § 812-002-0180

Current through Register Vol. 63, No. 12, December 1, 2024
Section 812-002-0180 - Contractor Became Aware of the Requirement

"Contractor became aware of the requirement" (to license) as used in ORS 701.131 includes but is not limited to the date a letter or a proposed order is mailed to the address of record from the agency indicating that the contractor was performing the work of a contractor and must be licensed with the Construction Contractors Board.

Or. Admin. Code § 812-002-0180

CCB 4-1998, f. & cert. ef. 4-30-98; CCB 7-2000, f. 6-29-00, cert. ef. 7-1-00; CCB 9-2008, f. 6-11-08, cert. ef. 7-1-08

Stat. Auth.: ORS 670.310 & 701.235

Stats. Implemented: ORS 701.131