Or. Admin. Code § 734-051-5040

Current through Register Vol. 63, No. 12, December 1, 2024
Section 734-051-5040 - Effective Period of Construction Permits
(1) Effective Period. A construction permit is effective for the time period specified on the permit. The region manager shall extend the time period of a construction permit for good cause shown.
(2) Revocation of Permit. The region manager may revoke a construction permit where the permit holder fails to conform to the terms of the construction permit including any special provisions, mitigation measures, conditions, or agreements.

Or. Admin. Code § 734-051-5040

HWD 16-2011(Temp), f. 12-22-11, cert. ef. 1-1-12 thru 6-29-12; HWD 8-2012, f. 6-27-12, cert. ef. 6-29-12

Stat. Auth.: ORS 184.616, 184.619, 374.310-374.314, 374.345 & 374.355

Stats. Implemented: ORS 374.300-374.360, §27, ch. 330, OL 2011