Current through Register Vol. 63, No. 12, December 1, 2024
Section 635-042-0001 - Management and Catch Reporting AreasManagement and Catch Reporting Zones shall include those waters of the Columbia River defined as follows:
(1) Zone 1 is easterly of a line projected from the knuckle of the south jetty on the Oregon bank to the inshore end of the north jetty on the Washington bank, and westerly of a line projected from a beacon light at Grays Point on the Washington bank to the flashing 4-second red buoy "44" off the easterly tip of Tongue Point on the Oregon bank.(2) Zone 2 is easterly of a line projected from a beacon light at Grays Point on the Washington bank to the flashing 4-second red buoy "44" off the easterly tip of Tongue Point on the Oregon bank, and westerly of a line projected from the 4-second flashing green light "81" on the Washington bank to a boundary marker on the easterly end of the Beaver Terminal Pier in Oregon, including all waters of Grays Bay, those waters of Deep River downstream of the Highway 4 Bridge, all waters of Seal Slough, those waters of Grays River downstream of a line projected between fishing boundary markers on both banks at the Leo Reisticka farm, and those waters of Elokomin Slough and Elokomin River downstream of the Highway 4 Bridge.(3) Zone 3 is easterly of a line projected from the 4-second flashing green light "81" on the Washington bank to a boundary marker on the easterly end of the Beaver Terminal Pier in Oregon, and westerly of a line projected true west from the east or upstream bank of the Lewis River mouth in Washington.(4) Zone 4 is easterly of a line projected true west from the east or upstream bank of the Lewis River in Washington, and westerly of a line projected true north from Rooster Rock on the Oregon bank, and those waters of Camas Slough downstream of the western most powerline crossing at the James River Mill.(5) Zone 5 is easterly of a line projected true north from Rooster Rock on the Oregon bank, and westerly of a line projected from a deadline marker on the Oregon bank (approximately four miles downstream from Bonneville Dam Powerhouse 1) in a straight line through the western tip of Pierce Island, to a deadline marker on the Washington bank at Beacon Rock.(6) Area 2S is from a downstream boundary of a true north/south line through flashing red 4-second light "50" near the Oregon bank to an upstream boundary of a straight line from a deadline marker on the Oregon bank (approximately four miles downstream from Bonneville Dam Powerhouse 1) through the western tip of Pierce Island, to a deadline marker on the Washington bank at Beacon Rock.Or. Admin. Code § 635-042-0001
FWC 10-1988, f. & cert. ef. 3-4-88; FWC 54-1989 (Temp), f. & cert. ef. 8-7-89; FWC 90-1989, f. & cert. ef. 9-6-89; DFW 9-2007, f. & cert. ef. 2-14-07; DFW 142-2008, f. & cert. ef. 11-21-08Stat. Auth.: ORS 183.325, 496.118 & 506.119
Stats. Implemented: ORS 506.129 & 507.030