Time periods required or allowed by the Act or these rules shall be computed in calendar days. The first full day after the time begins to run is counted as the first day. If the last day is a Saturday, Sunday, or State holiday, the period runs until the end of the next business day.
Or. Admin. Code § 438-085-0131
Stat. Auth.: ORS 183.335 & ORS 656.726(5)
Stats. Implemented: ORS 654.025(2)