Following the operational life of the facility, the certificate holder shall reclaim the mine site by modifying overburden and waste dump slopes to grades favorable to reclamation and by implementing surface water management measures to prevent water collection or erosion in the area and to aid in revegetating the site.
Or. Admin. Code § 345-095-0118
Stat. Auth.: ORS 469.556
Stats. Implemented: ORS 469.470