Current through Register Vol. 63, No. 12, December 1, 2024
Section 340-093-0140 - Detailed Plans and Specifications RequiredExcept as provided in OAR 340-093-0070(4):
(1) Any person applying for a solid waste disposal or waste tire storage permit must submit plans and specifications conforming with current technological practices, and sufficiently detailed and complete so that the department may evaluate all relevant criteria before issuing a permit. The plans and specifications must follow the organizational format, and include the level of information detail, as required by the department. The department may refuse to accept plans and specifications that are incomplete and may request such additional information as it deems necessary to determine that the proposed disposal or waste tire storage site and site operation will comply with all pertinent rules of the department.(2) Engineering plans and specifications submitted to the department must be prepared and stamped by a professional engineer with current Oregon registration.(3) If in the course of facility construction any person desires to deviate significantly from the approved plans, the permittee must submit a detailed description of the proposed change to the department for review and approval prior to implementation. If the department deems it necessary, a permit modification must be initiated to incorporate the proposed change.Or. Admin. Code § 340-093-0140
DEQ 41, f. 4-5-72, ef. 4-15-72; DEQ 26-1981, f. & ef. 9-8-81;; DEQ 5-1993, f. & cert. ef. 3-10-93, Renumbered from 340-061-0035; DEQ 10-1994, f. & cert. ef. 5-4-94; DEQ 17-1997, f. & cert. ef. 8-14-97; DEQ 6-2009, f. & cert. ef. 9-14-09; DEQ 11-2023, amend filed 07/21/2023, effective 7/21/2023Statutory/Other Authority: ORS 459
Statutes/Other Implemented: ORS 459.015 & 459.205(1)