Current through Register Vol. 63, No. 12, December 1, 2024
Section 340-040-0190 - Update Procedure(1) A Wellhead Protection Plan must be recertified every five years from the date of prior Department certification.(2) Recertification of the present Plan can take place if all the following conditions apply:(a) No conditions that could potentially modify the boundaries of the Wellhead Protection Area have occurred;(b) An updated inventory is completed and submitted which shows that no new potential sources of contamination have moved into the Wellhead Protection Area which are not addressed in the existing Plan;(c) The management practices outlined in the existing Plan are still appropriate and being implemented;(d) The existing contingency element in the Plan is still relevant; and(e) All signatories to the existing Plan agree to recertify the Plan by signing the recertification request letter.(3) If a certified Plan cannot meet the conditions under section (2) of this rule, then a revised Wellhead Protection Plan must be resubmitted for certification. A revised plan shall require: (a) Form a Team to develop the Plan. The Team can either be a new group formed for the specific purpose of developing a Plan or it can be an existing group that is assigned the additional duty of developing a Plan;(b) Identify the elements under OAR 340-040-0170 where the Plan is no longer adequate or relevant;(c) Modify the Plan in those areas identified in subsection (b) of this section to meet conditions outlined in OAR 340-040-0170 and OAR 340-040-0180;(d) Perform and submit a new potential source inventory; and(e) Submit to the Department for review and certification per OAR 340-040-0180.Or. Admin. Code § 340-040-0190
DEQ 1-1996, f. & cert. ef. 1-18-96Stat. Auth.: ORS 468 & ORS 468B
Stats. Implemented: ORS 468 & ORS 468B