Or. Admin. Code § 340-214-0310

Current through Register Vol. 63, No. 10, October 1, 2024
Section 340-214-0310 - Planned Startup and Shutdown
(1) This rule applies to any source where startup or shutdown of a production process or system may result in excess emissions, and
(a) That is a major source; or
(b) That is in a non-attainment or maintenance area for the regulated pollutant which may constitute excess emissions; or
(c) From which DEQ requires the application in section (2).
(2) The owner or operator must obtain prior DEQ authorization of startup and shutdown procedures. The owner or operator must submit to DEQ a written application for approval of new procedures or modifications to existing procedures. The application must be submitted in time for DEQ to receive it at least 72 hours before the first occurrence of a startup or shutdown event to which the procedures apply. The application must:
(a) Explain why the excess emissions during startup and shutdown cannot be avoided;
(b) Identify the specific production process or system that will cause the excess emissions;
(c) Identify the nature of the air contaminants likely to be emitted and estimate the amount and duration of the excess emissions; and
(d) Identify specific procedures to be followed that will minimize excess emissions at all times during startup and shutdown.
(3) DEQ will approve the procedures if it determines that they are consistent with good pollution control practices, will minimize emissions during such period to the extent practicable, and that no adverse health impact on the public will occur. The owner or operator must record all excess emissions in the excess emissions log, as required in OAR 340-214-0340(3). Approval of the procedures does not shield the owner or operator from an enforcement action, but DEQ will consider whether the procedures were followed in determining whether an enforcement action is appropriate.
(4) Once DEQ approves startup and shutdown procedures, the owner or operator does not have to notify DEQ of a planned startup or shutdown event unless it results in excess emissions.
(5) When notice is required by section (4), it must be made in accordance with OAR 340-214-0330(1)(a).
(6) DEQ may revoke or require modifications to previously approved procedures at any time by written notification to the owner or operator.
(7) No startups or shutdowns that may result in excess emissions associated with the approved procedures in section (3) are allowed during any period in which an Air Pollution Alert, Air Pollution Warning, or Air Pollution Emergency has been declared, or during an announced yellow or red woodstove curtailment period in areas designated by DEQ as PM2.5 or PM10 nonattainment areas.
(8) The owner or operator is subject to the requirements under All Other Excess Emissions in OAR 340-214-0330 if the owner or operator fails to obtain DEQ approval of start-up and shutdown procedures in accordance with section (2).

NOTE: This rule is included in the State of Oregon Clean Air Act Implementation Plan that EQC adopted under OAR 340-200-0040.

Or. Admin. Code § 340-214-0310

DEQ 42-1990, f. 12-13-90, cert. ef. 1-2-91; DEQ 4-1993, f. & cert. ef. 3-10-93; DEQ 12-1993, f. & cert. ef. 9-24-93, Renumbered from 340-020-0360; DEQ 19-1993, f. & cert. ef. 11-4-93; DEQ 19-1996, f. & cert. ef. 9-24-96; DEQ 14-1999, f. & cert. ef. 10-14-99, Renumbered from 340-028-1410; DEQ 6-2001, f. 6-18-01, cert. ef. 7-1-01; DEQ 8-2007, f. &cert. ef. 11-8-07; DEQ 7-2015, f. & cert. ef. 4/16/2015

Stat. Auth.: ORS 468.020

Stats. Implemented: ORS 468A.025