Or. Admin. Code § 330-260-0110

Current through Register Vol. 63, No. 12, December 1, 2024
Section 330-260-0110 - Compliance
(1) The owner, or their contractor representative, are responsible for completing all required building code inspections and incorporating all energy efficiency measures included in the original, or amended, plan designs.
(2) The owner, or their contractor representative, are responsible for completing all required utility verification inspections to participate in utility above code energy efficiency programs.
(3) The Department reserves the right to conduct a physical inspection of all sites that have received an incentive and to audit all documentation relating to a project receiving an incentive.
(4) The Director may order the revocation of an incentive or portion of an incentive under the program if the Director finds that the incentive was obtained by fraud or misrepresentation, or by mistake or miscalculation by the applicant or Department. As soon as the order of revocation becomes final, the Department shall proceed to recover the incentive or portion of the incentive that is subject to the order of revocation. All moneys provided to an owner or contractor attributable to the fraudulently or mistakenly obtained incentive or portion of the incentive shall be forfeited.
(5) A person aggrieved by a decision of the Director to revoke or reduce the amount of an incentive may request a contested case hearing under ORS Chapter 183 (Administrative Procedures Act).

Or. Admin. Code § 330-260-0110

DOE 2-2022, adopt filed 03/21/2022, effective 3/21/2022

Statutory/Other Authority: ORS 469.040 & Oregon Laws 2021, chapter 669 (House Bill 5006)

Statutes/Other Implemented: Oregon Laws 2021, chapter 669 (House Bill 5006)