Or. Admin. Code § 137-048-0310

Current through Register Vol. 63, No. 12, December 1, 2024
Section 137-048-0310 - Expired or Terminated Contracts; Reinstatement
(1) If a Contracting Agency enters into a Contract for Architectural, Engineering, Photogrammetric Mapping, Transportation Planning or Land Surveying Services or Related Services and that Contract subsequently expires or is terminated, the Contracting Agency may proceed as follows, subject to the requirements of subsection (2) of this rule:
(a) Expired Contracts. If the Contract has expired as the result of Project delay caused by the Contracting Agency or caused by any other occurrence outside the reasonable control of the Contracting Agency or the Consultant, and if no more than one year has passed since the Contract expiration date, the Contracting Agency may amend the Contract to extend the Contract expiration date, revise the description of the Architectural, Engineering, Photogrammetric Mapping, Transportation Planning or Land Surveying Services or Related Services required under the Contract to reflect any material alteration of the Project made as a result of the delay, and revise the applicable performance schedule. Beginning on the effective date of the amendment, the Contracting Agency and the Consultant shall continue performance under the Contract as amended; or
(b) Terminated Contracts. If the Contracting Agency or both parties to the Contract have terminated the Contract for any reason and if no more than one year has passed since the Contract termination date, then the Contracting Agency may enter into a new Contract with the same Consultant to perform the remaining Architectural, Engineering and Land Surveying Services, or Related Services not completed under the original Contract, or to perform any remaining Architectural, Engineering, Photogrammetric Mapping, Transportation Planning or Land Surveying Services or Related Services not completed under the Contract as adjusted to reflect a material alteration of the Project.
(2) The Contracting Agency may proceed under either subsection (1)(a) or subsection (1)(b) of this rule only after making written findings that amending the existing Contract or entering into a new Contract with the Consultant will:
(a) Promote efficient use of public funds and resources and result in substantial cost savings to the Contracting Agency;
(b) Protect the integrity of the Public Contracting process and the competitive nature of the Procurement process by not encouraging favoritism or substantially diminishing competition in the award of Contracts; and
(c) Result in a Contract that is still within the scope of the final form of the original Procurement document.

Or. Admin. Code § 137-048-0310

DOJ 11-2004, f. 9-1-04, cert. ef. 3-1-05; DOJ 20-2005, f. 12-27-05, cert. ef. 1-1-06; DOJ 15-2009, f. 12-1-09, cert. ef. 1-1-10; DOJ 10-2011, f. 11-29-11, cert. ef. 1-1-12

Stat. Auth.: ORS 279A.065, OL 2011, ch 458

Stats. Implemented: ORS 279A.065 & 279C.110, OL 2011, ch 458