Or. Admin. Code § 137-048-0240

Current through Register Vol. 63, No. 12, December 1, 2024
Section 137-048-0240 - Protest Procedures
(1) RFP Protest and Request for Change. Pursuant to ORS 279C.110(8) [HB 2769 (Oregon Laws 2019, Chapter 55)], Consultants may submit a written protest of anything contained in an RFP and may request a change to any provision, specification or Contract term contained in an RFP, no later than seven (7) calendar days prior to the date Proposals are due, unless a different deadline is indicated in the RFP. Each protest and request for change must include the reasons for the protest or request, and any proposed changes to the RFP provisions, specifications or Contract terms. The Contracting Agency may not consider any protest or request for change that is submitted after the submission deadline.
(2) Protest of Consultant Selection. Pursuant to ORS 279C.110(8) [HB 2769 (Oregon Laws 2019, Chapter 55)], Consultants may submit a written protest of the Contracting Agency's selection of a Consultant for award of a Contract as follows:
(a) Single Award. In the event of an award to a single Proposer, the Contracting Agency shall provide to all Proposers a copy of the selection notice that the Contracting Agency sent to the highest ranked Proposer. A Proposer who claims to have been adversely affected or aggrieved by the selection of the highest ranked Proposer may submit a written protest of the selection to the Contracting Agency no later than seven (7) calendar days after the date of the selection notice unless a different deadline is indicated in the RFP. A Proposer submitting a protest must claim that the protesting Proposer is the highest ranked Proposer because the Proposals of all higher ranked Proposers failed to meet the requirements of the RFP or because the higher ranked Proposers otherwise are not qualified to perform the Architectural, Engineering, Photogrammetric Mapping, Transportation Planning or Land Surveying Services or Related Services described in the RFP.
(b) Multiple Award. In the event of an award to more than one Proposer, the Contracting Agency shall provide to all Proposers copies of the selection notices that the Contracting Agency sent to the highest ranked Proposers. A Proposer who claims to have been adversely affected or aggrieved by the selection of the highest ranked Proposers may submit a written protest of the selection to the Contracting Agency no later than seven (7) calendar days after the date of the selection notices, unless a different deadline is indicated in the RFP. A Proposer submitting a protest must claim that the protesting Proposer is one of the highest ranked proposers because the Proposals of all higher ranked Proposers failed to meet the requirements of the RFP, or because a sufficient number of Proposals of higher ranked Proposers failed to meet the requirements of the RFP. In the alternative, a Proposer submitting a protest must claim that the Proposals of all higher ranked Proposers, or a sufficient number of higher ranked Proposers, are not qualified to perform the Architectural, Engineering, Photogrammetric Mapping, Transportation Planning or Land Surveying Services or Related Services described in the RFP.
(c) Effect of Protest Submission Deadline. A Contracting Agency may not consider any protest that is submitted after the submission deadline.
(3) Resolution of Protests. A duly authorized representative of the Contracting Agency shall resolve all timely submitted protests within a reasonable time following the Contracting Agency's receipt of the protest and once resolved, shall promptly issue a written decision on the protest to the Proposer who submitted the protest. If the protest results in a change to the RFP, the Contracting Agency shall revise the RFP accordingly and shall re-advertise the RFP in accordance with these rules.

Or. Admin. Code § 137-048-0240

DOJ 11-2004, f. 9-1-04, cert. ef. 3-1-05; DOJ 20-2005, f. 12-27-05, cert. ef. 1-1-06; DOJ 19-2007, f. 12-28-07, cert. ef. 1-1-08; DOJ 10-2011, f. 11-29-11, cert. ef. 1-1-12; DOJ 15-2019, amend filed 12/23/2019, effective 1/1/2020

Statutory/Other Authority: ORS 279A.065, OL 2011 & ch 458

Statutes/Other Implemented: ORS 279A.065 & 279C.110, OL 2011 & ch 458