Current through Register Vol. 64, No. 1, January 1, 2025
Section 123-046-0080 - Tide Gate Planning Project Application Eligibility CriteriaThe Department will determine tide gate planning project application eligibility using criteria including but not limited to the following:
(1) The application must demonstrate that the study scope will include all elements needed to develop a shovel ready tide gate project consistent with OAR 123-046-0060(1).(2) All required permits and regulatory authorizations must be addressed through the study scope.(3) The study scope must result in feasibility documentation consistent with OAR 123-046-0060(2).(4) The study scope must include a plan to communicate with all impacted landowners throughout the course of the planning project.Or. Admin. Code § 123-046-0080
OBDD 21-2020, temporary adopt filed 10/05/2020, effective 10/5/2020through 4/1/2021; OBDD 4-2021, adopt filed 03/15/2021, effective 3/15/2021Statutory/Other Authority: ORS 285A.075 & Ch 10, OL 2020
Statutes/Other Implemented: Ch 10, OL 2020