Okla. Admin. Code § 800:30-3-4

Current through Vol. 42, No. 4, November 1, 2024
Section 800:30-3-4 - Site preparation
(a) If any trees and shrubs are removed by road construction, pad preparation, pit construction or any other site preparation for mineral exploration or production, they will be piled at nearby locations for wildlife shelter as recommended by the Department.
(b) Unless otherwise directed by the Department, a minimum of 6 inches of topsoil will be removed for road construction or any site preparation and it will be stored in topsoil stockpiles for later restoration. When topsoils are less than 6 inches, the available topsoil will be stockpiled and stabilized according to Department recommendations.
(c) The operator will be responsible for keeping the road and site free of trash and litter at all times.
(d) Disposal of solid waste will be in accordance with provisions of the "Oklahoma Solid Waste Management Act" and "Rules and Regulations" of the State Board of Health promulgated thereto.

Okla. Admin. Code § 800:30-3-4

Amended at 23 Ok Reg 1591, eff 7-1-06; Amended at 25 Ok Reg 2128, eff 7-1-08