Current through Vol. 42, No. 7, December 16, 2024
Section 310:661-2-7 - Plan review fees(a) Each hospice inpatient facility construction project will be charged a review fee based on the cost of the design and construction of the building project as follows: (1) Project cost less than $10,000.00: $250.00 Fee(2) Project cost $10,000.00 to $50,000.00: $500.00 Fee(3) Project cost $50,000.00 to $250,000.00: $1000.00 Fee(4) Project cost $250,000.00 to $1,000,000.00: $1500.00 Fee(5) Project Cost greater than $1,000,000.00: $2000.00 Fee(b) The review fee must be paid when stage one project plans are submitted to the Department for review. The fee will cover the cost of review for up to two (2) stage one and two (2) stage two submittals. If a stage one or stage two submittal is not approved after two (2) submissions, another review fee based on the cost of the project will be required for the third submittal. Fast-track projects will be allowed two (2) reviews for each package submitted. If a fast-track stage package is not approved after the second submittal, another review fee based on the cost of the project will be required with the third submittal of the package.Okla. Admin. Code § 310:661-2-7
Added at 21 Ok Reg 1303, eff 5-27-04Amended by Oklahoma Register, Volume 39, Issue 24, September 1, 2022, eff. 9/11/2022