As a condition of receiving a license, and annually thereafter, the water bottler shall receive a plant inspection demonstrating compliance with the Good Manufacturing Practices and Operational Requirements of these regulations. Said inspection shall be conducted by the State in which the bottling facility is located, by the FDA, or by a third party inspection organization (such as NSF) acceptable to the Department.
Okla. Admin. Code § 310:225-11-6