Section 300:35-13-1 - Permit required(a) The contour, elevation or surface of any of GRDA's lands or the reservoir bed shall not be changed in any manner whatsoever by the construction of retaining walls, erosion control devices, dams, dikes, jetties, channels, canals or landings until and unless a permit has been issued by GRDA.(b) No person, firm, partnership, corporation or other entity may excavate, dredge, stabilize or make any improvement or change upon GRDA land or waters until a permit has been issued by GRDA. Approval from the Federal Energy Regulatory Commission (FERC), the U.S. Army Corps of Engineers (Corps), and other state and local agencies may also be required. All such activities shall be performed in strict accordance with the plans and specifications approved by GRDA (and, if required, by FERC and the Corps). Additionally, an approved wetland delineation report and metals testing report may be required prior to the commencement of any dredging or excavation activity.Okla. Admin. Code § 300:35-13-1
Added at 23 Ok Reg 1329, eff 5-25-06; Amended at 27 Ok Reg 1801, eff 6-25-10Amended by Oklahoma Register, Volume 34, Issue 24, September 1, 2017, eff. 9/11/2017