Okla. Admin. Code § 252:515-11-74
Current through Vol. 42, No. 8, January 2, 2025
All boreholes must be plugged with pelletized or chipped bentonite and rehydrated after the core sampling is completed.
Okla. Admin. Code § 252:515-11-74
All boreholes must be plugged with pelletized or chipped bentonite and rehydrated after the core sampling is completed.
Okla. Admin. Code § 252:515-11-74