Okla. Admin. Code § 165:5-7-6.2

Current through Vol. 42, No. 7, December 16, 2024
Section 165:5-7-6.2 - Multiunit horizontal wells in targeted reservoirs
(a) The application, which shall be limited to a single well, and the notice of hearing on the application, for an order approving a multiunit horizontal well in a targeted reservoir pursuant to 52 O.S. §87.8 shall be served no less than fifteen (15) days prior to the date of the hearing, by regular mail, upon each person or governmental entity having the right to share in production from each of the affected units covered by the application.
(b) Notice of hearing regarding an application for an order approving a multiunit horizontal well in a targeted reservoir pursuant to 52 O.S. §87.8 shall be published as provided in OAC 165:5-7-1(n)(2).
(c) The application for an order approving a multiunit horizontal well in a targeted reservoir shall contain the following:
(1) The legal description of the affected units.
(2) The name and address of the applicant and proposed operator of the proposed well.
(3) The name and depth of each targeted reservoir to be affected, including any potential adjacent common source of supply.
(4) The information required by 52 O.S. §87.8(B)(4).
(5) Allegations concerning the existence of facts relating to the proposed well as provided in 52 O.S. §87.8(B)(6).
(6) Reference to any companion application, identified by the type of requested relief, such as any application for spacing, for location exception, for increased density, for pooling, for modification of any previous pooling order, or for any other relief that may be appropriate under the specific facts of a cause, if such companion application is filed in conjunction with or is pending at the time of the filing of the application for multiunit horizontal well(s).
(d) An order approving an application for a multiunit horizontal well in a targeted reservoir shall require the allocation of the reasonable drilling, completion and production costs and of the commingled production and proceeds in accordance with 52 O.S. §87.8(B) and the map(s) addressed in 52 O.S. §87.8(B)(4)(b) must be attached to the order.
(e) Any pooling application filed pursuant to 52 O.S. §87.8(B)(3) involving a multiunit horizontal well for a targeted reservoir shall be filed pursuant to OAC 165:5-7-7.
(f) In the event a multiunit horizontal well covered by 52 O.S. §87.8 is intended to be the initial unit well in any horizontal well unit that exceeds six hundred forty (640) acres plus tolerances and variances allowed by statute, the contemplated completion interval of such well shall exceed ten thousand five hundred sixty (10,560) feet, absent a showing of reasonable cause.
(g) The units that are covered by any multiunit well application filed under this Section, in which the subject multiunit horizontal well is proposed to be drilled and completed, shall not constitute "an adjoining or cornering tract of land or drilling and spacing unit, currently producing from the same common source of supply, toward which tract or unit the well location has been or is proposed to be moved" under OAC 165:5-7-9.

Okla. Admin. Code § 165:5-7-6.2

Added at 28 Ok Reg 1893, eff 5-19-11 (emergency); Added at 29 Ok Reg 938, eff 7-1-12
Amended by Oklahoma Register, Volume 32, Issue 23, August 17, 2015, eff. 8/27/2015
Amended by Oklahoma Register, Volume 35, Issue 24, September 4, 2018, eff. 10/1/2018
Amended by Oklahoma Register, Volume 36, Issue 21, July 15, 2019, eff. 8/1/2019