For the purpose of obtaining a lower rate by receiving electric service or a higher rate by supplying electricity for purchase through one meter, the producer will not be permitted to extend or connect his electric wiring installation across or under a street, alley, or other public space in order to obtain connection with adjacent property, unless such extension is made pursuant to a special contract or filed rate schedule.
Okla. Admin. Code § 165:40-3-3