Section 165:10-15-15 - Production tests and reports for enhanced oil recovery projects(a) Within 30 days of commencement of any enhanced oil recovery project, the operator shall file with the Conservation Division an inventory of all the wells located within the boundaries of the project completed in the approved common source of supply showing the name of the project and the new OTC Production Unit Number (including merge number) and the following for each well: (1) Previous OTC Production Unit Number.(3) Well Name and Number.(4) Legal location, including quarter quarter quarter quarter section.(5) Current status (producer, injector, observation, or temporarily abandoned). The inventory shall also include the current daily (24 hour) production and injection rates for the project.
(b) The operator shall notify the Conservation Division in writing within 30 days of the completion of any new well or the change in status of any existing well in the project.(c) Until the operator submits the required test results for any enhanced oil recovery project as provided in subsection (a), no allowable shall be assigned to the project. If said test results are filed late, then the allowable shall be effective the first day of the following month after the Conservation Division accepts the tests.(d) All initial tests shall be conducted as set forth in subsection (a).(e) Annual testing shall not be required except as provided in OAC 165:10-1-6.Okla. Admin. Code § 165:10-15-15
Amended at 16 Ok Reg 2206, eff 7-1-99Amended by Oklahoma Register, Volume 32, Issue 23, August 17, 2015, eff. 8/27/2015.