The owner or operator of a solid waste transfer facility who holds a permit to install issued pursuant to Chapter 3734. of the Revised Code shall do the following:
(A) Construct the transfer facility in accordance with the authorizing document.(B) Comply with rules 3745-555-500 to 3745-555-599 of the Administrative Code and with rules 3745-512-01, 3745-512-02, 3745-512-17, 3745-512-30, 3745-512-50, 3745-512-51, 3745-512-55, 3745-512-60, 3745-512-450 and 3745-512-460 of the Administrative Code. Rules 3745-555-510 to 3745-555-549 of the Administrative Code do not apply if an engineered component is not included in the facility's design. However, if an engineered component is included in the facility's design, and has not yet been constructed, then this paragraph is applicable.
(C) Upon completion of construction of the transfer facility, or modification thereof, submit a construction certification report in accordance with rule 3745-512-50 of the Administrative Code including the results of all testing and verification that the construction requirements in rules 3745-555-510 and 3745-555-520 of the Administrative Code were met in addition to any additional construction, testing, and verification requirements approved in a permit to install.[Comment: Rule 3745-512-17 of the Administrative Code addresses requests to use an alternative construction material.]
Ohio Admin. Code 3745-555-500
Five Year Review (FYR) Dates: 1/3/2024 and 01/03/2029
Promulgated Under: 119.03
Statutory Authority: 3734.02
Rule Amplifies: 3734.02
Prior Effective Dates: 04/01/2017Effective: 4/1/2017
Five Year Review (FYR) Dates: 04/01/2022
Promulgated Under: 119.03
Statutory Authority: 3734.02
Rule Amplifies: 3734.02