owner or operator, of a new industrial waste landfill or residual waste landfill facility, an existing industrial waste landfill or residual waste landfill facility undergoing a lateral or vertical expansion, and of any industrial waste landfill or residual waste landfill facility undergoing closure in accordance with rule 3745-30-09 of the Administrative Code shall implement and maintain a ground water monitoring program capable of determining the impact of the landfill facility on the quality of ground water occurring within the uppermost aquifer system and all significant zones of saturation above the uppermost aquifer system underlying the landfill facility. The ground water monitoring program shall comply with paragraphs (B) to (F) of this rule and shall be protective of human health and safety and the environment. The ground water monitoring program shall be documented as a written ground water monitoring program plan as part of a landfill facility's permit to install application or closure plan, as applicable. The ground water monitoring program plan shall describe the owner or operator's program and how the plan complies with this rule. The ground water monitoring program shall be implemented upon final approval of the permit to install application or closure plan. The owner or operator shall use the methods documented in the plan. Changes to an approved plan shall be submitted to Ohio EPA sixty days before implementation of those changes.
Ohio Admin. Code 3745-30-08
Five Year Review (FYR) Dates: 11/5/2020 and 05/28/2026
Promulgated Under: 119.03
Statutory Authority: 3734.02, 3734.12
Rule Amplifies: 3734.02, 3734.12
Prior Effective Dates: 01/13/1992, 08/15/2003, 05/18/2015