Any person who proposes to construct, convert to, or operate an enhanced recovery project shall submit an application for a permit to the division on a form provided by the division.
After the submittal of an application for an enhanced recovery project permit, the division shall, within five working days, review the application to verify that the required information has been submitted. After a determination by the division that the application is complete as required by this rule, it shall be date-stamped by the division and the applicant shall be notified. Notification of the application shall be published by the division in the weekly circular in accordance with section 1509.06 of the Revised Code. In addition, legal notice shall be published by the applicant in a newspaper of general circulation in the county in which the proposed project is situated. A copy of the notice shall also be delivered to all owners and operators of wells within the area of review producing from or injecting into the same formation proposed as the injection formation. Proof of publication, publication date, and an oath as to the delivery to those entitled to personal notice shall be filed with the division within thirty days after the application was date-stamped by the division. The legal notice shall contain at least the following information:
Ohio Admin. Code 1501:9-5-05
Promulgated Under: 119.03
Statutory Authority: 119.03
Rule Amplifies: 1509.21, 1509.22
Prior Effective Dates: 11/06/1967, 06/01/1982, 04/18/1984 (Emer.), 07/02/1984, 06/19/1989, 04/15/2004
Rule promulgated under: RC 119.03
Rule authorized by: RC 1509.03
Rule amplifies: RC 1509.21, 1509.22(C)(1)
RC 119.032 review dates: 9/16/03, 1/27/04, 4/15/09