The board shall hold meetings at such times and such places as the board designates to administer an examination to persons desiring to become certified as certificate holders or geothermal system drillers. The board shall give no less than ten days' written notice to each applicant of the time and place of such examination. The board shall develop separate examinations for the certification of water well contractors, water well pump and pitless unit installers, monitoring well contractors, and geothermal system drillers.
N.D. Admin Code 90-02-01-02.1
General Authority: NDCC 43-35-10
Law Implemented: NDCC 43-35-12