As a condition on all construction permits, the owner of the dam, dike, or other device will provide the department with "as built" plans within six months after the dam, dike, or other device has been constructed to provide details of the modifications that occurred during construction.
N.D. Admin Code 89-08-02-07
General Authority: NDCC 61-03-13
Law Implemented: NDCC 61-16.1-38