N.D. Admin. Code 89-08-02-03.1

Current through Supplement No. 394, October, 2024
Section 89-08-02-03.1 - Time to complete construction of structure

Construction may not begin until a construction permit is obtained. Construction must be completed and the department must be notified of completion in writing within the period specified by the department on the permit, beginning from the date of final permit approval. The completion period does not begin until any appeal is complete.

N.D. Admin Code 89-08-02-03.1

Adopted by Administrative Rules Supplement 2015-355, January 2015, effective 1/1/2015.
Amended by Administrative Rules Supplement 2022-387, January 2023, effective 1/1/2023.

General Authority: NDCC 61-03-13

Law Implemented: NDCC 61-16.1-38