Upon receipt of a complete water management plan, the state engineer shall cause the plan to be reviewed to determine if appropriate requirements are satisfied. Such review shall be complete when possible not more than sixty days from the date of receipt of a complete application.
General Authority: NDCC 28-32-02, 61-02-11, 61-03-13
Law Implemented: NDCC 61-02-14
N.D. Admin Code 89-04-02-01