Section 89-02-01-09.11 - Conditions to permitsUnless otherwise specifically stated:
1. All permits must include the following conditions:a. The project and the rights granted under the permit are subject to modification to protect the public health, safety, and welfare.b. Construction must be completed within two years from the date of final approval or the permit is void. The two-year period does not begin until any appeal is complete.2. All permits of statewide or interdistrict significance must include the following conditions:a. All highly erodible drainage channels must be seeded to a sod-forming grass.b. Vegetative cover must be adequately maintained for the life of the project or control structures must be installed.c. Receipt of a permit does not relieve an applicant from liability for damages resulting from any activity conducted under the permit. The director or board may attach other conditions to the permit if necessary.
N.D. Admin Code 89-02-01-09.11
Effective February 1, 1997; amended effective April 1, 2000.Amended by Administrative Rules Supplement 2015-355, January 2015, effective 1/1/2015.Amended by Administrative Rules Supplement 2022-387, January 2023, effective 1/1/2023.General Authority: NDCC 61-03-13
Law Implemented: NDCC 61-32-03