N.D. Admin. Code 69-09-01-19

Current through Supplement No. 394, October, 2024
Section 69-09-01-19 - Extensions of service
1. The utility shall make all extensions to its mains and services where the investment is justified by the anticipated revenue to be received.
2. In the event the utility does not believe that the extension is justified, the commission shall, when so requested by one or more prospective customers desiring such extension and upon proper hearing, determine whether or not such extension should be made, and shall determine the respective amounts that the prospective customer or customers and the utility shall pay.
3. When so requested by a prospective customer engaged in the operation of a licensed trailer court for month-to-month parking of mobile homes, the utility shall make extension to its mains and services, subject to the provisions of subsections 1 and 2, to provide natural gas service through a master meter installed in a location within the confines of the mobile trailer court. The trailer court operator shall have service facilities to individual trailer parking locations which the operator shall own and maintain constructed by competent and qualified persons, and shall arrange for inspection by and approval from a responsible inspector to assure that the service facilities from the meter location to the mobile home locations and gas service facilities and appliances to and within mobile homes to be served comply with piping and appliance ordinances or requirements of applicable rules and regulations of any authority vested with jurisdiction of the subject matter.

General Authority: NDCC 49-02-11

Law Implemented: NDCC 49-02-11

N.D. Admin Code 69-09-01-19