Chapter 43-02-02.2 - In Situ Leach Mining Rules
- Section 43-02-02.2-01 - Definitions
- Section 43-02-02.2-02 - Scope of chapter
- Section 43-02-02.2-03 - Permit required
- Section 43-02-02.2-04 - Submission of permit application
- Section 43-02-02.2-05 - Review for completeness
- Section 43-02-02.2-06 - Review period
- Section 43-02-02.2-07 - Permit applications and annual operating fees
- Section 43-02-02.2-08 - Notice of hearing
- Section 43-02-02.2-09 - Information added after filing date
- Section 43-02-02.2-10 - Notice to agencies
- Section 43-02-02.2-11 - Summary document
- Section 43-02-02.2-12 - Permit approval or denial
- Section 43-02-02.2-13 - Bond
- Section 43-02-02.2-14 - Permit application - General requirements
- Section 43-02-02.2-15 - Permit application - General contents
- Section 43-02-02.2-16 - Permit application - Additional baseline information
- Section 43-02-02.2-17 - Permit application - Mine operations plan
- Section 43-02-02.2-18 - Permit application - Reclamation plan
- Section 43-02-02.2-19 - Determination of ground water restoration demonstration
- Section 43-02-02.2-20 - Ground water restoration values
- Section 43-02-02.2-21 - Establishing baseline water quality and control parameters in new mining areas
- Section 43-02-02.2-22 - Technical revisions to an in situ leach mine permit
- Section 43-02-02.2-23 - Designation of exempted aquifers
- Section 43-02-02.2-24 - Injection wells subject to this chapter
- Section 43-02-02.2-25 - Well location and protection
- Section 43-02-02.2-26 - Well construction requirements - General
- Section 43-02-02.2-27 - Well construction requirements - Injection wells
- Section 43-02-02.2-28 - Monitoring wells - Minimum requirements
- Section 43-02-02.2-29 - Disposal of drill cuttings
- Section 43-02-02.2-30 - Mechanical integrity
- Section 43-02-02.2-31 - Supervision of well construction and testing
- Section 43-02-02.2-32 - Requirements for plugging drill holes and repair, conversion, and plugging wells
- Section 43-02-02.2-33 - Corrective actions for improperly sealed wells
- Section 43-02-02.2-34 - Authorizing new injection wells within permit area boundary
- Section 43-02-02.2-35 - Design and construction of surface facilities
- Section 43-02-02.2-36 - Construction quality assurance plan
- Section 43-02-02.2-37 - Pipeline design and construction requirements
- Section 43-02-02.2-38 - Radioactive element recovery plant and satellite facility design and construction requirements
- Section 43-02-02.2-39 - Radioactive element by product material handling and disposal systems
- Section 43-02-02.2-40 - Disposal of liquid waste
- Section 43-02-02.2-41 - Disposal of nonradioactive solid waste
- Section 43-02-02.2-42 - Prohibitions - Injection volumes and pressure
- Section 43-02-02.2-43 - Production area operational monitoring requirements
- Section 43-02-02.2-44 - Production area monitoring well location and spacing requirements
- Section 43-02-02.2-45 - Nonproduction zone monitoring
- Section 43-02-02.2-46 - Subsidence monitoring
- Section 43-02-02.2-47 - Confinement of recovery fluid
- Section 43-02-02.2-48 - Excursions - Reporting requirement
- Section 43-02-02.2-49 - Excursions - Verifying analysis
- Section 43-02-02.2-50 - Excursions - Sampling frequency
- Section 43-02-02.2-51 - Excursions - Remedial action
- Section 43-02-02.2-52 - Excursions - Controlled
- Section 43-02-02.2-53 - Excursions - Not controlled
- Section 43-02-02.2-54 - Criteria for determination of adequacy of remedial action plan
- Section 43-02-02.2-55 - General reporting requirements
- Section 43-02-02.2-56 - Well construction records
- Section 43-02-02.2-57 - Well plugging records
- Section 43-02-02.2-58 - Maintenance and retention of records
- Section 43-02-02.2-59 - Ground water restoration requirements
- Section 43-02-02.2-60 - Restoration sampling procedure
- Section 43-02-02.2-61 - Restoration progress reports
- Section 43-02-02.2-62 - Final restoration - Restoration values achieved
- Section 43-02-02.2-63 - Restoration values not achieved
- Section 43-02-02.2-64 - Closure of mine site following restoration
- Section 43-02-02.2-65 - Postclosure plan - Postclosure bond - Estimated costs for postclosure care
- Section 43-02-02.2-66 - Reclamation of surface facilities
- Section 43-02-02.2-67 - Radiation survey of surface facilities at mine closure
- Section 43-02-02.2-68 - Radiation standards for closure of surface facilities
- Section 43-02-02.2-69 - General postclosure inspection, annual report, and maintenance activities
- Section 43-02-02.2-70 - Postclosure operation of monitoring systems
- Section 43-02-02.2-71 - Ground water contamination during the postclosure period
- Section 43-02-02.2-72 - Approval of the end of the postclosure period
- Section 43-02-02.2-73 - Available information on in situ leach mines
- Section 43-02-02.2-74 - Final bond release
- Section 43-02-02.2-75 - Additional information may be required
- Section 43-02-02.2-76 - Application for hearing
- Section 43-02-02.2-77 - Hearing participants by telephone
- Section 43-02-02.2-78 - Hearings - Complaint proceedings - Emergency proceedings - Other proceedings
- Section 43-02-02.2-79 - Investigatory hearings
- Section 43-02-02.2-80 - Official notice
- Section 43-02-02.2-81 - Notice of order by mail
- Section 43-02-02.2-82 - Record of proceedings
- Section 43-02-02.2-83 - Designation of examiners
- Section 43-02-02.2-84 - Powers and duties of examiner
- Section 43-02-02.2-85 - Examiner's recommended findings, conclusions, and proposed order
- Section 43-02-02.2-86 - Commission order
- Section 43-02-02.2-87 - Prehearing motion practice