In addition to sections 33.1-20-04.1-05 and 33.1-20-04.1-09, at closure, an owner or operator shall cover an existing unit with a layer of compacted soil material having a thickness of eighteen inches [45.7 centimeters] or more and a hydraulic conductivity of 1 x 10 -7 centimeters per second or less. The compacted layer must be free from cracks and extrusions of solid waste. A second layer of twelve inches [30.5 centimeters] or more of clay-rich soil material suitable for serving as a plant root zone must be placed over the compacted layer. At least six inches [15.2 centimeters] of suitable plant growth material must be placed over the covered landfill and the facility planted with adapted grasses. The total depth of final cover must be three feet [91.4 centimeters] or more, as required to achieve subsection 3 of section 33.1-20-06.1-02. The requirements of this section may be modified by the department if the permit applicant demonstrates that an alternative design will appropriately limit percolation of liquid into the waste.
N.D. Admin Code 33.1-20-06.1-03
General Authority: NDCC 23.1-08-03; S.L.2017, ch.199, § 1
Law Implemented: NDCC 23.1-08-03; S.L.2017, ch. 199, § 23