All solid waste management facilities and activities must be performed, constructed, operated, and closed in a manner consistent with the permit application and subject to any modifications specified through permit conditions.
N.D. Admin Code 33.1-20-02.1-04
General Authority: NDCC 23.1-08-03; S.L. 2017, ch. 199, § 1
Law Implemented: NDCC 23.1-08-03, 23.1-08-09; S.L. 2017, ch. 199, § 23