Current through Register Vol. 39, No. 8, October 15, 2024
Section 28B .0509 - PAVINGWhen paving, the licensed contractor shall:
(1) Follow manufacturer's recommendations and specifications;(2) Choose paving materials that are appropriate for the project, based on the contractor's professional judgment;(3) Install paving on a well-compacted base that will prevent settlement;(4) Install paved surfaces to allow for surface drainage and to prevent ponding;(5) Install reinforcement in concrete slabs so that the reinforcement is suspended within the concrete and not resting on the base course;(6) Not pour concrete if air temperatures, away from artificial heat or in the shade, is less than 35 degrees Fahrenheit;(7) Not pour concrete if the air temperature in the shade is 90 degrees Fahrenheit and rising or if the concrete temperature is greater than 95 degrees Fahrenheit;(8) Use a vibratory compacting device to set unit pavers and after joints are swept; and(9) Utilize an edge restraint on unit paver installations.21 N.C. Admin. Code 28B .0509
Authority G.S. 89D-15(2); 89D-15(16);
Temporary Adoption Eff. January 1, 2016;
Eff. September 1, 2016.Authority G.S. 89D-15(2); 89D-15(16);
Temporary Adoption Eff. January 1, 2016;
Adopted by North Carolina Register Volume 31, Issue 07, October 3, 2016 effective 9/1/2016.