Current through Register Vol. 39, No. 11, December 2, 2024
Section 06B .0404 - ELIGIBLE COSTSCosts eligible for RIAP funding are as follows:
(1) Reasonable engineering costs;(2) Site preparation, including necessary grading and drainage to construct track(s);(5) Grade crossings and signals.19A N.C. Admin. Code 06B .0404
Authority G.S. 136-44.36; 143B-350(f) and (g);
Eff. April 30, 1997;
Amended Eff. April 1, 1999;
Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. October 24, 2015.Authority G.S. 136-44.36; 143B-350(f) and (g);
Eff. April 30, 1997;
Amended Eff. April 1, 1999.