The mine maps should be correlated with the reclamation plan. The approximate areas to be mined during the life of the permit should be clearly marked.
If reclamation is to be accomplished concurrently with mining, then show segments that are to be mined and reclaimed during each year of the permit.
Add drawings showing typical sections or cross sections and layout of proposed reclamation where such drawings will assist in describing reclamation.
15A N.C. Admin. Code 05B .0104
Eff. February 1, 1976;
Amended Eff. April 1, 1990; May 1, 1982; September 1, 1979; January 31, 1979.
Eff. 2/1/1976;
Amended Eff. 4/1/1990; May 1, 1982; September 1, 1979; January 31, 1979.