The engineer who has inspected the construction of or on the dam shall submit written certification bearing his professional seal, unless exempted under the provisions of G.S. 89C-25, that the dam and all appurtenances have been built, repaired, altered, or removed in conformance with the plans, specifications, and drawings approved by the Director and that the dam is safe.
15A N.C. Admin. Code 02K .0216
Eff. June 15, 1980;
Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. December 23, 2017.
Eff. 6/15/1980.