Current through Register Vol. 39, No. 11, December 2, 2024
Section 02K .0213 - CONSTRUCTION SCHEDULEThe applicant shall submit a construction schedule that includes:
(1) Techniques and work force to be used to insure that the dam is constructed according to the plans and specifications;(2) A construction schedule that includes the estimated time to complete the construction activities;(3) Techniques to be used to divert the stream flow to prevent interference with construction and hazard to life, health, or property;(4) The extent and method of quality control shall be subject to approval of the Director.15A N.C. Admin. Code 02K .0213
Authority G.S. 143-215.26; 143-215.27; 143-215.31;
Eff. June 15, 1980;
Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. December 23, 2017.Authority G.S. 143-215.26; 143-215.27; 143-215.31;
Eff. 6/15/1980.