15A N.C. Admin. Code 1E.0113

Current through Register Vol. 39, No. 13, January 2, 2025
Section 01E .0113 - EXTENSIONS OF TIME PERIODS

The Secretary may extend any of the time periods prescribed by this Subchapter. Such an extension shall not exceed 15 days.

15A N.C. Admin. Code 01E .0113

Authority G.S. 143-215.101;
Eff. June 16, 1980;
Amended Eff. October 1, 1984.
Authority G.S. 143-215.101; 143-215.100;
Eff. 6/16/1980;
Amended Eff. 10/1/1984.
Readopted by North Carolina Register Volume 37, Issue 21, May 1, 2023 effective 4/1/2023.