Application must be made by written petition which shall be addressed to the Water Power and Control Commission, Albany, N. Y., and shall be signed in the name of the board of supervisors by an officer acting by authority of such board and shall be verified by such officer.
N.Y. Comp. Codes R. & Regs. Tit. 6 § 604.2