Each person and public corporation required to obtain a water transport fee for each intake facility equal to $100 per million gallons of fresh water withdrawn or transported pursuant to such permit.
N.Y. Comp. Codes R. & Regs. Tit. 6 § 486.1
Each person and public corporation required to obtain a water transport fee for each intake facility equal to $100 per million gallons of fresh water withdrawn or transported pursuant to such permit.
N.Y. Comp. Codes R. & Regs. Tit. 6 § 486.1