Current through Register Vol. 46, No. 45, November 2, 2024
(a) The permittee shall file reports, on forms provided by the department, at the times indicated in this section and at other such times as the department may require.(b) A report shall be required at the time of permit renewal and shall accompany the renewal application. The report shall include the number of acres of affected land and the number of acres reclaimed during the report year.(c) A report may be required to provide the department with information to be compiled in an annual report relative to the mined land reclamation program. Said report may be requested either during the active operation of the mine, after mining has ceased, or as the land is being reclaimed.(d) A written termination of mining notice shall be filed within 30 days after such termination of mining.(e) If the department extends the reclamation period, a report indicating the status of reclamation during such extension, shall be required on a monthly basis unless a longer period is prescribed by the department.N.Y. Comp. Codes R. & Regs. Tit. 6 § 422.4