Current through Register Vol. 46, No. 45, November 2, 2024
Section 383-6.7 - Cost estimates for implementing the post-closure plan(a) Every applicant or permittee must submit to the department a detailed written estimate of the cost, in current dollars, for implementing the post-closure plan as required by section 383-6.3(b)(2)(ii) of this Subpart. The cost estimate must be based on the cost of implementing the post-closure plan as approved or amended by the terms and conditions of the permit. The cost estimate must include the costs of the permittee hiring a third party to implement the post-closure plan.(b) The cost estimate for implementing the post-closure plan must reflect consideration of the size, type, and location of the land disposal facility and the nature and volume of waste to be disposed.(c) The permittee must submit a revised cost estimate to the department no later than 30 days after the department has approved a change in the post-closure plan that affects the cost of implementing the post-closure plan. The department may require the permittee to submit a revised financial assurance plan, in accordance with section 383-6.3(f) of this Subpart, which relects such revised cost estimate.(d) On an annual basis, until closure of the land disposal facility, the permittee must revise the estimated cost for implementation of the post-closure plan to account for inflation. This revised cost estimate must be submitted to the department in accordance with section 383-6.3(d) of this Subpart.N.Y. Comp. Codes R. & Regs. Tit. 6 §§ 383-6.7