Current through Register Vol. 46, No. 45, November 2, 2024
Section 363-9.4 - Closure construction certificationThe construction certification required in subdivision 360.16(j) of this Title must include a report that includes the following:
(a) the results of all CQA and CQC testing required in section 363-4.5 and Subpart 363-6 of this Part. The report must include documentation of any failed tests and all retesting performed and descriptions of procedures used to correct the improperly installed, damaged, or irregular material;(b) record drawings noting any deviation from the approved closure plans; and(c) a comprehensive narrative including, but not limited to, daily reports from the project engineer and a series of color photographs of major project features.N.Y. Comp. Codes R. & Regs. Tit. 6 §§ 363-9.4
Adopted New York State Register September 20, 2017/Volume XXXIX, Issue 38, eff. 11/4/2017