N.Y. Comp. Codes R. & Regs. Tit. 6 §§ 363-6.4

Current through Register Vol. 46, No. 45, November 2, 2024
Section 363-6.4 - Bedrock separation

A minimum of ten feet of vertical separation is required between bedrock and the base of the constructed liner at all points along the liner system, except as provided in section 363-6.11(a)(4) of this Part. The material between the base of the constructed liner and bedrock, whether natural or backfilled, is subject to department approval. The material must consist of low permeability soils with silty and clayey characteristics and with the ability to attenuate and absorb contaminants.

N.Y. Comp. Codes R. & Regs. Tit. 6 §§ 363-6.4

Adopted New York State Register September 20, 2017/Volume XXXIX, Issue 38, eff. 11/4/2017
Amended New York State Register June 7, 2023/Volume XLV, Issue 23, eff. 7/22/2023
Amended New York State Register June 21, 2023/Volume XLV, Issue 25, eff. 7/23/2023